Case study
Two chemicals producers merge and deliver their savings eight months early
Two specialty chemicals producers in Germany and Switzerland
- Of announced savings delivered
- 115%
- Annual run-rate savings
- €86M
- Ahead of the savings plan
- 8 months
- Of critical roles retained
- 94%

The challenge
The two companies made complementary specialty chemicals for coatings and construction, with combined revenue of about €2.3 billion and 7,800 employees across fourteen plants. Both had been founded by families and still carried their founders’ habits: one centralized and engineering-led, the other decentralized and commercial.
The merger was announced with €75 million of annual cost savings, to be delivered within three years. Investors were skeptical. Both companies had completed smaller acquisitions that had underdelivered, and key customers had signaled that they would test the new company’s prices and service at the first opportunity.
Our approach
We were appointed four months before closing, which gave time to do the work that most integrations leave too late. Savings estimates were rebuilt from the bottom up, plant by plant and category by category, and each was assigned to the executive who would own it after closing.
The integration followed a few firm principles:
- The top three layers of leadership, about 140 roles, were selected and announced before day one, using the same structured assessment for candidates from both companies
- Customer-facing teams were left untouched for the first six months, with a named executive sponsor for each of the fifty largest accounts
- Procurement savings came first, since they carried the least risk to the business, followed by back-office consolidation and then the plant network
- A joint integration office met weekly, tracking savings against the budget rather than a separate program tracker
Works council consultations in both countries were planned into the timetable from the start. We met employee representatives early and shared the rationale for each change before it was announced.
The impact
The combined company reached €86 million in annual run-rate savings, 115 percent of the announced target, twenty-eight months after closing, eight months ahead of plan. Procurement contributed almost half, through consolidated purchasing of raw materials and logistics. Two smaller plants were merged into larger sites with no loss of capacity.
Ninety-four percent of the people in roles identified as critical were still with the company a year after closing. Revenue from the fifty largest customers grew by 3 percent over the same period, and none moved a major contract to a competitor.
“Everyone warned us that the cultures would clash. What made the difference was deciding the top three layers of leadership before closing, so nobody spent the first six months wondering about their job.”
More work
Related case studies
-22%Operating cost baseFinancial Services2025A regional bank takes 22% out of its cost base without closing a branch
Read the case
-36%Elective waiting timesHealthcare & Life Sciences2025A five-hospital system cuts elective waiting times by 36% in a year
Read the case
-27%Unplanned outagesEnergy & Utilities2024A grid operator cuts unplanned outages by 27% with predictive maintenance
Read the case
Have a decision on the table?
Tell us what you are weighing. A partner will reply within two working days, and the first conversation is on us.